GP: Preparation of a new traffic and transportation strategy - Hungary PDF Print E-mail

An information measure aiming at describing the future direction of transports and traffic development in Pécs

The City of Pecs with 170 thousand inhabitants is a middle-sized cultural, educational, commercial and health centre 40kms from the Croatian border. In November 2000 the early Christian burial chambers received the UNESCO World Heritage title.

Objectives / Innovative Aspects

The city of Pecs will analyse the central city areas in order to:

  • get more information on the present situation of traffic, transportation and public transportation in the city centre
  • be able to prepare a new integrated strategy in city traffic planning and management
  • gain new information on the future development of the parking facilities
  • gain new information on the alternatives of re-planning traffic in the city
  • describe the future directions of public transportation progress.

The Measure

The measure was originally not included in the Trendsetter measures. During the implementation of the project it was realized by Pecs, that all infrastructure developments and planning activities miss innovation and our existing plans and strategies do not give answers and solutions for the problems of traffic in the 21st century. It was realized only within Trendsetter, that there is a perspective in alternative fuel use for PT; there are opportunities to establish a fixed track PT network (tram, etc.) in Pecs. When the Trendsetter project was designed Hungary was not a member of the EU, even the fix date of the accession was not known. After the accession in 2004, a new financial perspective has opened up for the municipalities in Hungary, to find solutions for those problems, which were already known, but it was never thought, that solutions might be found in the next decades. Pecs - one of the most innovative cities of Hungary - would like to utilize the new financial resources (mainly ERDF and CF grants) for transportation development and innovation incubation.
The measure aims to prepare a local traffic and transportation strategy in order to meet the challenges of the huge increase in traffic (mainly due to the use of private cars) and to provide environment friendly solutions for the transportation needs of the citizens. All objectives face the same mission: Pecs would like to become Europe’s Cultural Capital by 2010 and it is inevitable to offer good quality transportation services. The strategy covers alternatives and suggestions for ‘inter-urban’ transportation, namely the development of the local airport, the highway construction (which fits into the Helsinki Corridors) and the ‘intra-city’ transportation challenges.
The strategy focuses on 2 aspects: access limitations in the city centre to offer better living and recreating conditions and the modernisation / paradigm change in public transportation. The strategy investigates public transportation development from 2 perspectives: feasibility of the introduction of fixed track public transportation modes and the perspective of fuel change for the existing bus fleet. Map attachments show the alternative solutions for transportation developments.
The strategy describes the vision of PT in Pecs by 2010, in order to be able to offer efficient public transportation for the visitors coming to Europe’s Cultural Capital. Considering the financial resources it focuses mainly on the utilization of the next Community Support Framework (2007-2013) and on the application of the public-private-partnership in providing communal transportation services.
The principles of the strategy will appear in the project proposals to be submitted in the framework of the National Development Plan, which co-ordinates the utilization of the Structural Funds in Hungary. The most important projects are:

  •  
    • re-positioning of the local bus station from the densely populated area to a suburban district;
    • establishment of a fixed track PT infrastructure;
    • road infrastructure developments related to the opening of the Expo Centre and the Pecs-Pogány Regional Airport

Implementation Status

During the implementation the city development department of Pecs started parallel activities:

  • the analysis of the present situation has been prepared based on actual counting / measurement of the traffic (this was performed in 2004);
  • the extension of the access restrictions in the city centre and the location of the parking houses / other parking facilities have been examined and plans have been elaborated to convert existing parking places into green areas;
  • the plan and programme of re-positioning the local bus station has been prepared;
  • the plans to establish a fixed track PT infrastructure have been worked out

.

(Expected) Results

The strategy itself does not result any change in the present system, as it only describes the direction of future investments, developments, therefore the before and after scenario are the same. If we investigate the long-term inpact, we may say, that it initiates a complete paradigm change in traffic and transporation in the City of Pécs.

Contact

Testosterone E CycleThere are three major facts that should be watched out for in all payday loans in the United States. When the problem is not treated, it can ruin intimate life of couples and destroy their relationships. Viagra Professional was produces not to let this happen. Professional means highly qualified. It strikes the target and doesn't allow a disorder to occupy man's body.
tuvturk

EST project case studies conducted by countries in cooperation with OECD


Home|Good Practices|Publication|Contact List|Useful Links|Notice Board
Copyright © EST Goes East Clearing House (EgE). All rights reserved.